PRICES OF ELECTRICAL WORKS

Price list of electrical works

Clear rates (prices without VAT) - you can plan the preliminary price of the work even before your arrival.

Darbas Price
General repair work
Cost of repair work (when the unit of work cannot be clearly determined) 30 €/val.
The prices of the works of the first stage
Arrival at the facility within the city limits + first hour of work 60,00 €
Inspection/troubleshooting/elimination of old electrical installation 20,00–25,00 €/val.
Dismantling of the old electrical installation 20,00–25,00 €/val.
Connecting a temporary light/switch/socket 5,00–6,00 €/vnt.
Cable laying (up to 2.5 sq. mm) 1,20–1,50 €/m.
Cable laying (2.5-10 sq mm) 2,00–2,50 €/m.
Cable laying (16-35 sq mm) 4,00–5,00 €/m.
Milling in masonry/block walls 4,00–5,00 €/m.
Milling in a concrete/monolithic wall 7,00–9,00 €/m.
Preparation of holes for nests - in plasterboard 4,00–5,00 €/vnt.
Preparation of holes for nests - in a masonry / block wall 6,00–7,50 €/vnt.
Preparation of holes for nests - in the red brick wall 7,50–9,00 €/vnt.
Preparation of holes for nests - in a concrete / monolith wall 8,00–10,00 €/vnt.
Drilling of capital walls / ceilings (up to 22 mm) 5,00–6,50 €/vnt.
Installation of the upper distribution panel 18,00–25,00 €/vnt.
Installation of the sub-panel - in the GKP wall 50,00–65,00 €/vnt.
Plasterboard installation - in a masonry / block wall 70,00–90,00 €/vnt.
Mod 12-24 of sub-module shield installation - in concrete 100,00–125,00 €/vnt.
36-48 mod. shield installation - in concrete 150,00–190,00 €/vnt.
Assembly of panel components 5,00–6,50 €/modulis
Drawing up an electrical diagram 7,00–9,00 €/vnt.
Kiti darbai 20,00–30,00 €/val.
Prices of works of the II stage
Installation of the socket outlet 4,00–5,00 €/vnt.
Installation of the connector 6,00–7,50 €/vnt.
Installation of the overhead socket 7,00–9,00 €/vnt.
Installation of the overhead connector 8,00–10,00 €/vnt.
Installation of a wall (BRA) lamp 15,00–20,00 €/vnt.
Installation of a recessed light fixture 7,00–9,00 €/vnt.
Hanging lamp installation 20,00–25,00 €/vnt.
LED profile installation 10,00–12,50 €/m.
LED strip installation 10,00–12,50 €/m.
Transformer / control panel installation 18,00–23,00 €/vnt.
Installation of hermetic / outdoor light 18,00–23,00 €/vnt.
Connecting a single-phase device 18,00–23,00 €/vnt.
Connecting a three-phase device 25,00–32,00 €/vnt.
Connecting the thermostat 12,00–15,00 €/vnt.
Installation of a plastic trough 3,00–4,00 €/m.
Bell / Fan Installation 18,00–25,00 €/vnt.
Drawing up an electrical diagram 7,00–9,00 €/vnt.
Connecting the recuperator/conditioner control panel 15,00–20,00 €/vnt.
Installation of an electric heater (coil). 25,00–35,00 €/vnt.
Kiti darbai 20,00–30,00 €/val.

Transparent rates

The prices are provided as an indicative price list. The final rate may depend on the nature of work, complexity and facility conditions.

How is the price calculated?

Most often, the price is determined by:

  • Scope and complexity of works (materials, type of walls, access, etc.).
  • Unit rate (€/unit, €/m) or hourly (€/hour).
  • Facility location (urban/rural if applicable).